
Home » Oil Rig – Confidential Client
APS worked closely with the Wood Group and it’s engineers on the oil rig to determine the best solution for this scenario.
After much discussion it was decided that the use of the mechanical LineStop equipment would be the best course of action.
With the mechanical LineStops in place the rig engineers were able to remove the required sections of pipe and install the valves further down the line.
Once the valves were installed the LineStops could be removed and capped off.