Home » NHS Scotland
APS came up with a plan to isolate the line where the repairs had to be affected whilst maintaining the supply of DHW to the critical wards.
This was achieved by installing two mechanical line stops into the pipeline to isolate the section of pipe where the valves had to be replaced and the pipe repaired.
As well as the isolation a temporary bypass was installed around the line stops to maintain the supply to the wards.
LineStopping provides a temporary mechanical isolation on a pipeline to allow repairs to be carried out and when incorporated with the bypass system can still maintain services to the end users.
All this work was carried out outside of normal working hours where demand on the system would be minimal.